Yodify Product Library
Instantly add the Atomic Toe Initiation Port and 50,000+ more product series to your store or catalog
Book Your Demo and See How
or create your store
Atomic Toe Initiation Port
Brand: Steelhaus Technologies IncSteelhaus’ Atomic Toe Initiation Port is designed to provide an economic means to initiate communication with the reservoir.
Usually placed at the toe of the well, the Atomic TP is activated when hydraulic pressure is applied to the casing string.
Once opened, a flow path is initiated to the reservoir facilitating pump down operations or even the placement of an initial stimulation treatment.
OperationThe Atomic’s port configuration promotes easy access to the reservoir. The use of a toe port initiation sub eliminates the requirements for an initial coil tubing trip to initiate pump down operations, resulting in substantial cost savings.
Features- Cost effective reservoir access
- Eliminates initial coil tubing trip
- Use with standard cementing procedures
- Large flow ports allow for high stimulation rate
- Sleeve shifts up to open and locks in position, eliminating risk of premature opening
- Rated to 20,000 psi
- Rated to 285 °F
Specifications
Nominal Size, in (mm)
- 4.5 [114.3]
- 5.5 [139.7]
Weightlb/ft
- 11.6 - 15.1
- 17.0 - 23.0
OD in (mm)
- 5.75 [146]
- 7.0 [177.8]
ID in (mm)
- 3.75 [92.25]
- 4.5 [114.3]
Length, in (mm)
- 30 [762]
- 35 [889]
Port Area in²
- 10.7
- 14
Internal Pressure Psi (MPa)
- 20,000 [137]
External Pressure Psi (MPa)
- 15,000 [103]
Temperature F (C)
- 285 [141]
Connections
- As Requested
Tensile LBS
- 350,000
- 550,000
- Horizontal, deviated and vertical wells
- Cemented wellbores